6/22/18 Embassy of Rwanda Click for Photos

The 1st floor and the basement are shaping up with an new look, todays engineer web joist and plywood are installed.. Masons are back onsite working on the elevator shaft wall..

Leave a Reply

Your email address will not be published. Required fields are marked *