6/1/18 Embassy of Rwanda Click for Photos

  1. The concrete block is being installed on the elevator shaft wall and tomorrow we will be removing the existing 1st floor joist system papering for the new floor joist..

Leave a Reply

Your email address will not be published. Required fields are marked *