3/20/18 Embassy of Rwanda Click for Photos

Today the demo crew was able to expose some of the brick after removing the drywall and plaster on the perimeter walls.. This will allow us also to get the correct length required measurements to fabercate the new floor joist system..

Leave a Reply

Your email address will not be published. Required fields are marked *