7/14/18 Embassy of Rwanda Click for Photos

Posted on September 14, 2018September 15, 2018 by Brian Ehardt

Today not much rain fortunately, but the trades are making it happen.. much accomplished!!

Posted in UncategorizedLeave a comment

9/13/18 Embassy of Rwanda Click for Photos

Posted on September 13, 2018September 15, 2018 by Brian Ehardt

The block shaft wall for the elevator is complete out through the roof top ready for the pan deck to be installed..

Posted in UncategorizedLeave a comment

9/12/18 Embassy of Rwanda Click for Photos

Posted on September 12, 2018 by Brian Ehardt

Rain rain .. We are dried in ready to go.. Florence we are good and reDy..

Posted in UncategorizedLeave a comment

9/11/18 Embassy of Rwanda Click for Photos

Posted on September 11, 2018September 11, 2018 by Brian Ehardt

The Trades are moving on and the stairs are almost at the top..Florence is heading to the city soon .. we are starting to hunker down…

Posted in UncategorizedLeave a comment

9/10/18 Embassy of Rwanda Click for Photos

Posted on September 10, 2018September 10, 2018 by Brian Ehardt

The rain has been pouring outside, in a few days or so it’s suppose to be much worst but we will continue to move forward..

Posted in UncategorizedLeave a comment

9/07/18 Embassy of Rwanda Click for Photos

Posted on September 7, 2018September 7, 2018 by Brian Ehardt

The steel stairs are almost at the top, scheduling all trades to complete their rough-in.. soon to start hanging the drywall..

Posted in UncategorizedLeave a comment

9/06/18 Embassy of Rwanda Click for Photos

Posted on September 6, 2018September 6, 2018 by Brian Ehardt

Running through the roof is the block layers extension for the elevator hoist can be installed..

Posted in UncategorizedLeave a comment

9/05/18 Embassy of Rwanda Click for Photos

Posted on September 5, 2018 by Brian Ehardt

Today, more work on the roof top, hot heat wave in town 103 index.. the team keeps pushing right along..

Posted in UncategorizedLeave a comment

9/04/18 Embassy of Rwanda Click for Photos

Posted on September 4, 2018September 4, 2018 by Brian Ehardt

Happy to say! Lots of work is being complete from the basement up to the roof top.. the progress is being executed nicely..

Posted in UncategorizedLeave a comment

8/31/18 Embassy of Rwanda Click for Photos

Posted on September 1, 2018September 3, 2018 by Brian Ehardt

The Electricians are installing the fire alarm system and the duct work is being finalized up the tower.. the exterior prep and paint will commence soon..

Posted in UncategorizedLeave a comment

Posts navigation

Newer posts →

Archives

  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • November 2017

Meta

  • Log in

Like Us On Facebook

Like Us On Facebook

Hours & Info

161 Fort Evans Rd NE | Leesburg, VA 20176 | Suite 305
1-202-216-0077
info@ecggc.com
Monday - Friday
8AM-5PM
161 Fort Evans Rd NE Suite 305 | Leesburg VA, 20175
info@ecggc.com
(202) 216-0077
Zerif Lite developed by ThemeIsle