6/1/18 Embassy of Rwanda Click for Photos
The concrete block is being installed on the elevator shaft wall and tomorrow we will be removing the existing 1st floor joist system papering for the new floor joist..
The concrete block is being installed on the elevator shaft wall and tomorrow we will be removing the existing 1st floor joist system papering for the new floor joist..